QUESTION 21
What are the two valid methods of configuring a VSP during a new installation procedure? (Choose two.)
A. Import a Constitute file.
B. Use the Offline SVP tool.
C. Manually define the configuration.
D. Use the Configuration File Loader.
Answer: BC
QUESTION 22
A customer wants to install an Emulex HBA in a server accessing storage in a Hitachi VSP system. Where can you verify that the given configuration is supported?
A. VSP maintenance manual
B. HDS HBA implementation guide
C. Storage Navigator User’s Guide
D. HiFire on HDS intranet/extranet
Answer: D
QUESTION 23
Which document is designed to assist those involved in the sale, installation and support of Hitachi Enterprise storage systems to ensure proper installation planning?
A. the HiFire Pre-installation Report
B. the System Administration Guide
C. the HiPlan Service Guide
D. the System Assurance Document
Answer: D
QUESTION 24
A customer wants to de-install a USP which is currently virtualized behind a VSP. They have stopped the Host I/O to the affected LUNs and have unmounted them. What is the next sequence?
A. Delete LUN Paths > power off the USP
B. Switch off cache mode for the external volumes > power off the USP
C. Perform Disconnect External Storage for the USP > disconnect the external volumes > power off the USP
D. Delete LUN Paths > perform Disconnect External Storage for the USP > delete the external volumes > power off the USP
Answer: D
QUESTION 25
You need to install Hitachi Dynamic Link Manager (HDLM) on a Windows server. Which documentation provides detailed information about the supported Fibre Channel HBA drivers?
A. HDLM HBA Guide
B. HDLM Release Notes
C. HDLM Concepts and Planning Guide
D. HDLM for Windows Systems User’s Guide
Answer: B
QUESTION 26
A customer wants to create a new CLPR in their VSP. Why would you recommend performing this change during a period of low activity?
A. Because all Host I/Os must be stopped when resources are migrated to the new CLPR.
B. Because adding a CLPR may take a long time and can impact production.
C. Because the LUNs to be moved to the new CLPR must be unmounted or unmapped.
D. Because the VSP cache is in Write Through Mode during the creation of new CLPRs.
Answer: B
QUESTION 27
A customer wants to change a RAID Group from RAID 5 (7+1) to RAID 6 (6+2) during normal operation on a VSP. What must be done regardless of the System Option Mode (SOM) settings?
A. The customer must modify the RAID level in Storage Navigator 2.
B. The engineer must change the RAID level in the SVP Maintenance window.
C. The customer must backup and unmap the LUNs from the RAID 5 (7+1) RAID Group.
D. The engineer must remove all the disk drives from the RAID 5 (7+1) RAID Group, re-install and re- configure them.
Answer: C
QUESTION 28
Which three products can be used to configure and manage Hitachi Dynamic Provisioning (HDP) on a VSP? (Choose three.)
A. Protection Manager CLI
B. Device Manager GUI
C. Provisioning Manager GUI
D. Device Manager CLI
E. raidcom
Answer: BDE
QUESTION 29
Which statement about the VSP back-end architecture is correct?
A. The VSP has four 6Gbps SAS links per HDU able to connect to four drives within one HDU at the same time.
B. The VSP has eight 6Gbps SAS links per HDU able to connect to eight drives within one HDU at the same time.
C. The VSP has eight 4Gbps SAS links per HDU able to connect to eight drives within one HDU at the same time.
D. The VSP has eight 6Gbps SAS links per HDU able to connect to sixteen drives within one HDU at the same time.
Answer: B
QUESTION 30
The SVP has failed on a VSP and you have ordered a replacement. Which functionality is still available while waiting for the new SVP to arrive on site?
A. Configuration changes can be made using raidcom commands.
B. Hitrack can continue monitoring the VSP and report errors.
C. Configuration changes can be made using HiCommand CLI.
D. ShadowImage pairs can be managed with RAID Manager/CCI.
Answer: D
If you want to pass the Hitachi HH0-210 exam sucessfully, recommend to read latest Hitachi HH0-210 Dumps full version.